• pingveno@lemmy.world
    link
    fedilink
    English
    arrow-up
    3
    ·
    26 days ago

    Even if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.