• mondoman712@lemmy.ml
    link
    fedilink
    arrow-up
    4
    ·
    edit-2
    9 months ago

    Just to note, the 130 billion figure for HS2 isn’t just for the London to Birmingham leg.

    Also there’s a lot of things that went into making it expensive: a lack of high speed expertise, extra tunnels to satisfy nimbys, the government insisting on low risk contracts and changing plans constantly, etc

    • zephyreks@lemmy.mlOPM
      link
      fedilink
      arrow-up
      3
      arrow-down
      1
      ·
      9 months ago

      You know what, that’s a good point.

      However, Japan’s Chuo Shinkansen is like 90% tunneled or something crazy and the rest of Europe (and China and Japan) has a ton of high speed expertise to draw from.