First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • Ryumast3r@lemmy.world
    link
    fedilink
    English
    arrow-up
    7
    arrow-down
    2
    ·
    1 year ago

    I’m spooked by the fact that you have no idea how the US enriches uranium, or the difference between a power pressurized water reactor and a fast “breeder” reactor (if you were thinking of plutonium) or a centrifuge.

    The US enriches uranium using a gas-centrifuge. The US also no longer recycles spent nuclear fuel, but France does.